Present: Eduardo do Couto e Silva, Hartmut Sadrozinski, Steve Ritz, Tune Kamae, Ed Shippey, Martin Nordby, Bob Hartman, Bernard Phlips, Gary Godfrey, Michael Lovellette, Scott Williams, Tom Leisgang
AGENDA:
1) Announcements, agenda review, etc. (5')
2) Review of Functional Test Plan (15') -- Lovellette
The current draft document addresses functional testing of the full LAT, but the verification testing during integration must be defined and elaborated. In particular, the interfaces and operability of newly-integrated parts must be verified at each stage of the integration in a schedule-conscious manner. ACTION: Hartmut+Eduardo+Martin to draft the Integration Plan. This will be posted on the documents page for comment within the next two weeks, with an accompanying email.
3) Status of GSE and Software Plan (15') -- Williams
Scott promises a draft by 20 June. Check the documents page, and please send him comments.
4) Full-LAT vibe tests? (10') -- Nordby
We reviewed the table of options (see agenda item 2 from meeting 6 below, page 5 of the document), and continued the discussion. At issue are the many connections -- mechanical and electrical (bolts and connectors) -- in the LAT that will not be verified by subsystem testing. These are acceptance-level tests for workmanship. Thus, the question of the full-LAT vibe test is really a question of how best to do the workmanship testing on these connections. For example, would acoustic testing alone accomplish this task?
Martin and Ed are in contact with Scott Gordon, at GSFC, who is evaluating the coupled loads analysis, to get an assessment of these questions. Answer expected within two weeks.
5) Status of Environmental Test Plan (20') -- Nordby
Due to saturation, Martin needs more time on this. He is now working with ONE support to move this forward.
6) Status of Ground Calibration Plan (20') -- do Couto e Silva
The document is being revised by Eduardo to derive the tests more directly from the requirements. Next draft by 25 June. Eduardo reported that the discussions of whether there is a need for full-LAT beam testing have clarified the issues -- instead of listing the functional testing that a full-LAT beam test could accomplish, a list of the necessary functional testing will be generated and the options for how those tests can be performed will be explored.
7) AOB
We did not schedule the next meeting. There is plenty of work going on, and we will focus on the documents. All current versions of the documents will be available at the link at the top of the page, and email notifications will be sent as major revisions are posted.
Note that the room will be booked 30 minutes early for tuning/debugging the system.
Present: Tony, Martin, Scott Williams, Scott Sawyer, Eduardo, Hartmut, Bob Hartman, Steve, Tune
AGENDA:
1) Announcements, agenda review, etc. (5')
2) Review of status of the documents (30')
See document status page (link above).
- Environmental test plan -- little progress this week, but still on track for June 15 review. At the next meeting, Martin will present his recommendation and justification on the issue of whether or not to do full-LAT vibe testing.
- Functional test plan -- we reviewed the draft (Michael could not attend). There were many comments and suggestions for including missing items, which will be emailed to Michael and cc'd to everyone (ACTION). ACTION: Hartmut is drafting the functional test plan for the tracker, including a discussion of strategies, and will circulate this next week. This will be merged with the present document, and it may serve as a template for the other subsystems.
- The on-orbit calibration table was reviewed during the meeting. It has also been sent to others (Dave Thompson, Dave Bertsch, Seth Digel, Peter) for review. It appears this is sufficient for PDR, but additional comments are welcome.
- The GSE and support software document will be drafted by Scott Williams and Tom Leisgang next week, with a draft expected at the end of the week. Check the documents status page for updates.
- The ground calibration draft document was presented by Eduardo. He is on track for having the document done on time. He is pulling together the earlier documents and discussions, and has reviewed the EGRET SLAC calibration plan as a model. Issues to be resolved include low-energy photon calibrations and the hadron test matrix. Eduardo reports a division of opinion on whether to recommend putting the whole LAT in a beam. This is an important issue to resolve clearly, since it is likely to be the first question we'll be asked at PDR. The beam test subgroup will produce a document outlining the issues, and will make a recommendation at the next meeting. ACTION: Bob Hartman will try to find a copy of the EGRET Brookhaven calibration plan.
3) Report from the beam calibration subcommittee (10')
see above.
4) AOB
ACTION: Hartmut suggests we start placing documents that we have been using that are complete into Cyberdocs.
Note that the room will be booked 30 minutes early for tuning/debugging the system.
AGENDA:
1) Announcements, agenda review, etc. (5')
2) Vibe testing plans - Martin (20')
3) Review of status of the documents (20'')
4) AOB
Note that the room will be booked 30 minutes early for tuning/debugging the system.
We'll finish by 9:45 PDT to avoid conflicting with the BFEM pre-ship review.
PRESENT: Eduardo, Hartmut, Tune, Steve, Michael, Bernard, Ed, Martin, Scott.
AGENDA:
1) Announcements, agenda review, etc.(5')
2) Update on environmental test plan - Martin (5')
Awaiting LAT PS update; a big issue is the temperature range over which testing is done.
3) Update on beam test calibration plan - Eduardo/Tune/Hart-mut (10')
The beam test subgroup will meet next week (time TBA by Eduardo). After evaluating the work, the group will set a date for release of the Ground Calibration Test Plan.
4) Functional test plan document status - Michael (5')
Comments received. Draft to be released soon.
There was a good discussion about the need to include well-defined "stress testing" of the system, both during performance testing and functional testing, early and frequently throughout the I&T.
5) IOC GSE support document status - Scott (5')
Expect draft documents within 4 weeks.
6) To Vibe or Not to Vibe? - Martin/Ed (10')
Work on this has been delayed due to other pressing matters. Ed is investigating the proposals by the spacecraft vendors to evaluate their proposed observatory-level environmental testing. Martin and Ed will report back in two weeks.
7) Review of Action Items and finishing our work (20')
We will concentrate our efforts now on completing the listed documents. The emphasis in each document will be on the items needed for PDR, but the documents will be complete in that they will capture the current state of the planning on all items. Most documents should be ready for review within ~4 - 6 weeks. Links to the current versions will be provided here.
8) AOB
Note that the room is booked 30 minutes early for tuning/debugging the system.
AGENDA:
1) Announcements, agenda review, etc.(5')
2) Environmental test facilities, on-going issues -- Nordby (10')
3) Report from the Beam Test Subcommittee - do Couto e Silva et al (15')
4) Functional test planning status -- Lovellette (10')
5) Discussion of status of test and calibration plan -- all (5')
6) Status report on GSE requirements from functional test planning for LAT and subsystems -- Williams and Lovellette (20') [also see this presentation prepared by Scott]
7) Review of action items (10')
8) AOB
Present: do Couto e Silva, Hartman, Lovellette, Nordby, Phlips, Ritz, Sadrozinski, Shippey, Williams. See agenda above for presentations.
Note that the room is booked 30 minutes early for tuning/debugging the system.
AGENDA:
1) Announcements, etc. (5').
New draft document on the TKR tray testing from Nicola et al here .
2) Report from the Environmental Testing subgroup (see this document ).
1. Environmental testing-- Nordby and Nelson (10')
2. Functional testing-- Lovellette (10')
3. Cross-over testing-- Lauben (10')
4. Discussions, next steps (5')
3) Report from the Beam Test subgroup (30')
- Group activities are shown ot the subgroup web page here, and in a summary presentation here.
- Current draft of LAT PS Science performance testing here. (will merge with this version).
4) Review of action items and schedule for deliverables (10')
Present: do Couto e Silva, Hartman, Lauben, Lovellette, Nelson, Nordby, Phlips, Ritz, Sadrozinski, Shippey, Waite, Williams. See agenda above for presentations.
The full committee will meet on Monday, 16 April at 8:30 PDT (11:30
EDT). [When does Europe switch to daylight savings time??].
There will be a beam test subgroup meeting on Thursday, 12 April
at 11:00 PDT (14:00 EDT).
AGENDA:
1) Announcements, VRVS debugging, etc. (5')
2) First pass tests for LAT PS verification (15') Ritz and Nordby
3) Subsystem testing prior to LAT I&T:
[Elex/DAQ, FSW, and GSE planning will be done at a future meeting]
4) Status of LAT I&T Flow (10') Nordby_Lehman_Feb2001, Nordby_Nov2000
5) Discussion of facilities subgroups for beam testing and environmental testing (10')
6) Next meeting, AOB.
Present: do Couto e Silva, Haller, Hartman, Kamae, Lovellette, Nelson, Nordby, Phlips, Ritz, Sadrozinski, Shippey, Thompson, Williams.
See the links above for the presentations. The following issues and actions arose from the discussions.
We spun off two subgroups:
ACTION: Update LAT PS to reflect changes in the MSS, review operating mode requirements, review spec on livetime measurement precision. Ritz, Nordby, Thurston. Start change control process next week. OPEN.
ACTION: Document the qualification plan for the SSDs. Nelson and Sadrozinski. OPEN.
ACTION: LAT parts personnel (mechanical, electrical) pro actively discuss parts issues with each subsystem manager. Thurston will coordinate this. Started -- CLOSED.
ACTION: Post URL for Eric Grove's work on CAL calibration (see agenda item 3, CAL, above). Ritz (CLOSED -see references below).
ACTION: subsystem representatives on the committee (Phlips/Cordier, Hartman/Thompson, Sadrozinski/Mazziotta, Haller/Waite) review current I&T flow plan (see agenda item 4 above) and give feedback to Martin. Where possible, use this preliminary plan as a basis for starting planning for schedule, personnel, and facilities needs for the subsystems. OPEN.
Some issues from the discussions:
The subsystem representatives should discuss these within their respective subsystems.
The beam subgroup will address these issues.
EGRET Ground Calibration paper ApJ S88, 629(1993) . Available here.
EGRET Flight Calibration paper ApJ S123, 203(1999) . Available here.
Eric Grove's talk on CAL calibration planning, click here and look at slides 19-26.
Environmental and functional test planning draft document available here.
Science performance test planning draft document will hopefully go here soon! (see this link for ongoing work)
New draft document on the TKR tray testing from Nicola et al here .
Hartmut's writeup on justification for a full-LAT muon telescope facility available here.